• Call us: +91 97001 97007

  • info@canvasat85.com

  • 10:00 - 19:00

Tech Specifications

STRUCTURE

  • Earth Quake Resistant RCC framed structure designed with infill brick walls. Designed by Certified Structure Engineer.
  • Anti Termite Treatment at various stages of construction as required.

FLOORING

  • Living Room & Dining Area – Premium quality vitrified Tile. (Italian marble finish) size -4ft * 2ft
  • Other Bedrooms/ Servant Room – Premium quality Vitrified Tiles.(Italian marble finish) size -4ft * 2ft
  • Kitchen/Toilets/Balcony/ – Anti Skid Tiles.
  • Balcony Railings – MS Railings with Paint Finish and as per the design and elevation.

WALLS, CEILING & PAINT

  • Living Room & Dining Area/Master Bedroom/Other Bedrooms – Premium quality Paint. (Asian/Dulex or equivalent)
  • Servant Room/– Premium quality Paint. (Asian/Dulex or equivalent)
  • Kitchen – Ceramic tiles up to 2’above Counter, balance area in Premium quality Paint (Asian/Dulex or equivalent)
  • Modular Kitchen with Cabinets above & below the counter. Counter shall be Granite.
  • Toilets – Ceramic Tiles up to 7’height.

WINDOWS & DOORS

  • Living Room & Dining Area/Master Bedroom –Windows of high quality UPVC.
  • Other Bedrooms/Servant Room/Toilets – Windows of high quality UPVC.
  • Doors – Premium quality flush doors.

PLUMBING

  • Kitchen – Concealed (JINDAL) GI pipelines for hot & cold water. /SS Sink with single bowl & drain board & swivel spout.
  • Toilets
  • Concealed (JINDAL) GI pipelines for hot & cold water supply.
  • Single lever CP fitting of reputed brand (Kohler/Jaquar)
  • WC with Cistern (Kohler/Jaquar).
  • Granite Counter with Wash Basin (Kohler/Jaquar) and Mirror.
  • Towel Rail.
  • Service Balcony-Concealed (JINDAL) GI pipelines for water inlet and outlet for washing machine shall be provided.

ELECTRICAL

  • Living Room & Dining Area/Master Bedroom/Other Bedrooms/Study Room.
  • Copper wiring of RR Kabels/POLYCAB/HAVELLS in concealed PVC conduits.
  • Modular switches/MCBs of reputed make like Schneider/ABB
  • Provision for wall mounted split AC shall be provided including electrical wiring, copper pipe and drain pipe in all
  • 3 bedrooms, Drawing room and Dining Area.
  • Kitchen
  • Copper wiring of RR Kabels/POLYCAB/HAVELLS in concealed PVC conduits.
  • Switches and MCBs of Schneider/ABB.
  • Provision for fixing RO/Geyser/Chimney shall be made.

Toilets

  • Copper wiring of RR Kabels/POLYCAB/HAVELLS in concealed PVC conduits.
  • Provision for fixing Geyser shall be made.

Balcony

  • Electrical points for fan and lights and washing machine shall be provided.

KITCHEN

  • Fully Modular Kitchen Setup

LIFTS

  • High – Speed passenger lifts in each building of Otis/Kone/Fugitech/Johnson or Guineled

EXTERNAL FINISH

  • Building shall be finished in attractive paints Asian/Dule

POWER BACK-UP

  • Power back-up shall be provided to all the apartments, depending on the type of accommodation on the extra charge basis and provision for 100% power back-up in common areas.

WARDROBES

  • Modular Wardrobes in all the bedrooms.